ERP system implementation: in phases or all at once?

Share with others

Consider phased ERP system implementation when a useful part of the business can move separately and the temporary arrangements are manageable. Consider an all-at-once switch when splitting closely connected work would create more difficulty than it solves, provided all affected teams are ready. Base the choice on how work will continue, not simply on the preferred launch date.

When should you introduce an ERP system in phases?

Think of the ERP system as a shared workspace for customer information, projects, tasks and documents. The rollout decision is about when people begin using it for real work.

A phased rollout moves selected parts of the business into the new system in successive launches; an all-at-once rollout moves the agreed scope on one launch date. These approaches are described in Microsoft's Dynamics 365 deployment guidance.

For phasing, ask whether the first group can complete useful work without constant help from teams still using the old tools.

Compare disruption, staff learning and transition effort

SAP describes a single switch as concentrating change, while phasing limits the initial impact but extends the transition. Both approaches still carry a risk of disruption. See SAP's ERP implementation guidance.

For Dynamics 365, Microsoft describes phasing as allowing gradual adoption, while repeated launches can tire employees of ongoing change. A single launch concentrates adoption and support needs. Its deployment and release guide explains these tradeoffs.

Decision areaIf introducing in phasesIf switching at once
Daily workDefine the group or workflow affected by each launch.Prepare all affected teams for the same changeover.
Training and supportSchedule learning and support for each wave.Arrange cover for simultaneous training and early questions.
Learning before expansionUse the first wave to revise later ones.Resolve practice-run issues before the shared launch.
Transition effortInclude temporary arrangements and repeated launch work.Include company-wide launch support and a continuity plan.

Ask for separate estimates for temporary connections, staff training, support and repeated launches. Do not assume either rollout label means a lower total cost.

Choose a first phase that keeps connected work together

Oracle's guidance for Oracle Cloud recommends introducing tightly dependent processes together to avoid temporary links between old and new systems. It also recommends selecting a pilot with user numbers, transaction volumes, sponsorship and representativeness in mind. See Phasing Your Journey to Cloud.

Apply that principle by drawing a boundary around complete work, not the smallest feature list.

Illustrative example, not a customer case: a project-based business could move one representative team's customer information, projects, tasks and working documents together. Other teams would remain in existing tools initially. The first team should be able to find the relevant customer, organise a project, assign tasks and use the documents needed to complete its work.

That boundary is worth considering if the team can work largely within it and a manager can support the transition. Reject it if shared staff must constantly cross between old and new tools to update the same projects. In that case, consider moving the connected teams together or choosing a different first phase.

Do not select only the easiest team. Ask what its experience would teach you about the next launch.

Plan how daily work continues between launches

Phasing does not require every transaction to be entered twice: Microsoft's Dynamics 365 guidance distinguishes phased deployment from parallel operation, where both systems are used actively. Temporary connections may nevertheless be needed during a phased rollout. See Microsoft's rollout comparison.

Before approving the first phase, agree:

  • Which work moves now and what remains in existing tools.
  • Whether unfinished projects move with the team or finish in the old tool.
  • How staff find information needed from outside the first phase.
  • Who resolves transition problems and approves temporary workarounds.

Give temporary arrangements an owner and a condition for ending them. Review whether they remain manageable before adding another team.

For a single switch, plan how essential work continues if the launch has problems. Microsoft warns that returning to the previous system can be difficult or impossible.

Check readiness before the first launch—and before expanding

Planning, testing and training apply whichever rollout approach is chosen, as explained in Oracle's ERP implementation planning guide.

Microsoft's Dynamics 365 go-live guidance identifies testing, data transfer, transition plans, user training, access and support as readiness considerations. Its go-live preparation guide provides the underlying guidance.

Translate those considerations into business questions:

  • Can staff complete representative work, including common exceptions?
  • Is the information needed for active customers and projects available?
  • Can people access what their roles require?
  • Do unresolved problems have named owners and agreed next steps?
  • Is support available while employees learn the new way of working?

Before expanding a phased rollout, review whether the first group can finish normal work without recurring manual rescue. Agree which problems must be fixed before expansion. Judge readiness by usable work and available support, not by the date alone.

Ask for comparable rollout proposals before deciding

Ask potential suppliers for two rollout outlines covering the same intended ERP system scope: one staged and one using a single switch. Otherwise, you may be comparing different systems rather than different ways to introduce one.

Each outline should identify the first usable scope, connected work that must move together, staff time for training, temporary arrangements, support responsibilities and the conditions for proceeding. Ask what changes if the first launch needs more support than expected.

Choose phasing if the intermediate arrangement is workable and learning between launches is valuable. Choose a single switch if separating the work creates unacceptable complexity and the whole scope is ready.

For a discussion about ERP system development, bring your proposed first-phase scope and the work that cannot be interrupted to VIZUAL.